2020 – The retaining wall on the side of the 1000 building (facing 900) was replaced. The old, wooden railroad-tie wall was rotted and replaced with a beautiful, textured stone block wall. Additionally, a new metal fence was erected, and the parking spaces were restriped in the lot between 900/1000.